MIL-DTL-46796D
TABLE V. Classification of inspections.
Conformance
First
Acceptanc Cont-
Title
Requirement
Inspection
article
e (100%)
rol
Materials, design,
3.2, 3.2.1,
4.6.1 and
X
X
and construction
and 3.4
4.6.2
Environment
3.3
4.6.3
X
Low temperature
3.3.1.1
4.6.3.1.1
X
start without
external aids
High temperature
3.3.1.2
4.6.3.1.2
X
start without aids
Elevation
3.3.2
4.6.4
X
Humidity
3.3.3
4.6.5
X
Engine break-in run
3.5.1
4.6.10.1 thru
X
X
X
4.6.10.1.2
Speed range
3.5.2
4.6.10.2
X
X
X
Idle speed
3.5.2.1
4.6.10.2.1
X
Governor
3.5.3
4.6.10.3
X
X
X
Brake horsepower
3.5.4
4.6.10.4
X
X
X
Operating conditions
3.5.4.1
4.6.10.4
X
Torque
3.5.5
4.6.10.5
X
X
X
Exhaust smoke
3.5.6
4.6.10.6
X
X
X
density
Fuel consumption
3.5.7
4.6.10.7
X
X
Oil consumption
3.5.8
4.6.10.8
X
X
Oil pressure
3.5.8.1
4.6.10.8.1
X
X
X
Coolant
3.5.9
4.6.10.9
X
Limiting operating
3.5.10
4.6.10.10
X
X
temperatures
Supercharger
3.5.11
4.6.10.11
X
X
Endurance
3.5.12
4.6.10.12
X
Grades and slopes
3.6
4.6.11
X
Submersion
3.7
4.6.12
X
Steam and water jet
3.8
4.6.13
X
cleaning
Exterior surface
3.9
4.6.14
X
treatment
Engine nameplate
3.10
4.6.15
X
X
Workmanship
3.11
4.6.16
X
4.2.1 Preproduction inspection. When specified (see 6.2), the preproduction sample
shall consist of two diesel engines. Preproduction inspection shall include the examinations of
4.4 (see table IV) and the applicable tests of 4.6.1 through 4.6.16 (see table V).
10
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business