MIL-PRF-62541A
2.3 Non-Government publications. The following documents form a part of this
document to the extent specified herein. Unless otherwise specified, the issues of the documents
which are DoD adopted are those listed in the issue of the DoDISS cited in the solicitation.
Unless otherwise specified, the issues of documents not listed in the DoDISS are the issues of the
documents cited in the solicitation (see 6.2).
AMERICAN NATIONAL STANDARD INSTITUTE (ANSI)
ANSI/ASQC Z1.4
- Sampling Procedures and Tables for Inspection by
Attributes (DoD Adopted).
(Application for the copies should be addressed to the American National Standards
Institute, 11 West 42nd Street, New York, NY 10036.)
2.4 Order of precedence. In the event of a conflict between the text of this document and
the references cited herein, the text of this document takes precedence. Nothing in this document,
however, supersedes applicable laws and regulations unless a specific exemption has been
obtained.
3. REQUIREMENTS
3.1 First article. When specified (see 6.2), a first article sample shall be subjected to first
article inspection in accordance with 4.2.
3.2 Materials. Materials shall be in accordance with the manufacturer's materials
specifications for diesel engines. The materials shall be capable of meeting all the operational and
environmental requirements specified herein (see 4.5.1).
3.3 Design and construction.
3.3.1 Construction. All interface and envelope dimensions shall conform to drawings
11650200 and 11650249 (see 4.5.2).
3.3.2 Interchangeability. Component assemblies and parts shall be so constructed that
any part, except those furnished in matched sets or for which a selective fit is specified, may be
installed, replaced, and adjusted with no modification required (see 4.5.2).
3.3.3 Accessories and equipment. Unless otherwise specified herein, all accessories and
equipment shall be installed on the engine and properly adjusted (see 4.5.2).
3.3.4 Speed range. The engine shall be designed to operate satisfactorily under all loads
and conditions as specified herein throughout the specified speeds (see 4.5.2).
3
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business