MIL-DTL-62483A(AT)
(ft2/min) [0.09 meter squared/ minute (m2/min.)]. The jet pressure shall be not less than 100 psi
(689 kPa) and not more than 110 psi (758 kPa). Subsequent to the cleaning operation, the engine
and components shall be disassembled to the extent necessary to determine if any deterioration to
seals, hose, gaskets, or driving belts exists, and to determine if any entry of water has occurred
into the engine or any component. Any evidence of seals, hose, gasket, or driving belt
deterioration, or any sign of water entry resulting from above testing, shall be cause for rejection.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as
specified in the contract or order (see 6.2). When actual packaging of materiel is to be performed
by DoD personnel, these personnel need to contact the responsible packaging activity to ascertain
requisite packaging requirements. Packaging requirements are maintained by the Inventory
Control Point's packaging activity within the Military Department or Defense Agency, or within
the Military Department's System Command. Packaging data retrieval is available from the
managing Military Department's or Defense Agency's automated packaging files, CD-ROM
products, or by contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature which may be
helpful, but is not mandatory.)
6.1 Intended use. The engines covered by this specification are intended for the M809
and M939 series 5 ton trucks used by the United States Military Service in transporting personnel
or cargo, towing trailers or semitrailers, and recovering disabled equipment during military
operations. The engines are military unique because they are specially designed to interface with
the M809 and M939 trucks where no known commercial equipment can be substituted.
6.2
Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of this specification.
b. Engine classification (see 1.2 and 3.2.1).
c. Issue of DoDISS to be cited in the solicitation, and if required, the specific issue
of individual documents referenced (see 2.2.1 and 2.3).
d. When first article is required (see 3.1, 4.1.1 and 6.4).
e. Electromagnetic compatibility, if other than as specified (see 3.3.10.6).
f. Inspection conditions if other than as specified (see 4.2.2).
g. Packaging requirements (see 5.1).
16
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business